AI Prediction Index

AI Predictions Due in 2026

237 tracked claims have a 2026 deadline; 54 already graded. Every one gets a verdict when its date arrives: called it, half right, or missed.

Other years: 2027 · 2028 · 2029 · 2030

“Netflix plans to offer a wider array of ad formats this year, including enhanced interactive video ads that will roll out globally in the second quarter [of 2026], after testing modular interactive video ads in the U.S. and Canada in late 2025.”

Co-CEO, Netflix

Said Jan 20, 2026Deadline Jun 30, 2026Netflix Q4 2025 earnings call; The Current, January 21, 2026

Netflix said in November 2025 it was testing modular interactive video ads in the U.S. and Canada with 'encouraging' early results and reaffirmed a global Q2 2026 rollout on the January 2026 earnings call; no independent confirmation that the worldwide rollout was completed within Q2 2026 was found, so the outcome cannot yet be judged.

“Gemini 3 shows that scaling laws for pretraining are intact. This is the most important AI datapoint since the release of o1. This means that Blackwell models are likely to show a significant increase in performance when they come out in the second quarter of 2026. GPT-5 was not evidence of a slowdown in scaling laws.”

Managing Partner & CIO, Atreides Management

Said Nov 19, 2025Deadline Jun 30, 2026Gavin Baker on X, "Some thoughts on AI" thread, November 19, 2025

Blackwell-trained frontier models in fact shipped earlier than Q2 2026 — OpenAI's GPT-5.3 Codex (February 2026) was trained and served entirely on GB200 NVL72, and xAI's Grok 4.5/4.6 were built on GB200/GB300 — but whether they represent the 'significant increase in performance' Baker predicted is a judgment call that needs a benchmark-based resolution.

“We will increase our total AI capacity by over 80% this year [fiscal 2026], and roughly double our total datacenter footprint over the next two years, reflecting the demand signals we see.”

Chairman and CEO, Microsoft

Said Oct 29, 2025Deadline Jun 30, 2026Microsoft FY2026 Q1 earnings call, October 29, 2025

Fiscal 2026 ended June 30, 2026, but Microsoft never disclosed a total AI capacity figure to check the 80% claim; on the July 29, 2026 FY26 Q4 call Nadella said Microsoft added 88 new datacenters over the year and roughly a gigawatt of capacity in the quarter, and reiterated being 'on track to roughly double our overall capacity in just two years.'

“"Within 270 days of the date of this order, the Secretary shall... seek to demonstrate an initial operating capability of the [American Science and Security] Platform for at least one of the national science and technology challenges" — i.e. a working Genesis Mission AI science platform by August 21, 2026.”

President of the United States

The deadline has passed but the outcome is not yet publicly adjudicable: DOE contracted Accenture Federal Services in April 2026 for an 'early operating capability' sprint on the critical-minerals (CM2US) challenge and demonstrated a platform build at the July 22, 2026 Genesis Mission Summit, but DOE has not publicly confirmed that formal initial operating capability was demonstrated by August 21, 2026, and independent coverage of the summit called the mission 'not yet measurable.'

“The Les Ulis site (Essonne), a new 10 MW facility dedicated to inference operations, is scheduled to open in the third quarter of 2026.”

Co-founder and CEO, Mistral AI

Said May 28, 2026Deadline Sep 30, 2026Mistral AI, 'AI Now Summit 2026' announcements, 28 May 2026

The site, hosted in Digital Realty's Paris South campus with Nvidia GB300 GPUs, was described in August 2026 reporting as coming online in Q3 2026; the quarter has not yet closed.

“Aggregate cash capital expenditure across the largest hyperscalers (Microsoft, Amazon, Alphabet, Meta and Oracle) is on track to overtake their operating cash flow around Q3 2026 — capex is growing roughly 70% per year against about 23% annual growth in operating cash flow, pushing most hyperscalers toward external financing.”

AI research institute, Data Insights series

Q3 2026 results are not reported until late October 2026, so the crossover cannot yet be confirmed; corroborating evidence is mounting (FactSet reported in July 2026 that hyperscaler free cash flow was under mounting pressure, with incremental annual debt rising from 9% of capex in FY24 to 32% by mid-2026).

“Probably our AI revenue — not probably, definitely — our AI revenue will exceed all other SpaceX revenue probably in September, like next month.”

CEO of SpaceX (SpaceXAI) and Tesla

In Q2 2026 SpaceX reported $7.81 billion of revenue with roughly $2.56 billion from AI, so the crossover requires a large jump; September segment revenue will not be verifiable until SpaceX reports third-quarter results.

“Colossus 2 is 110k GB200 and 440k GB300. Another 220k GB300 will be fully operational next week.”

CEO of SpaceX and xAI (SpaceXAI)

Said Sep 25, 2026Deadline Oct 4, 2026Post on X (@elonmusk), September 25, 2026

The stated week runs through roughly October 4, 2026; no independent confirmation of the additional 220k GB300s being fully operational has been published yet.

“TSMC will raise its full-year revenue growth forecast to the low-to-mid 40% range from its current guidance of more than 40%, driven by strong demand for its 3-nanometre chips.”

Semiconductor analyst, Morgan Stanley

TSMC reports Q3 2026 results and updated full-year guidance on October 15, 2026; Q3 revenue already came in at a record NT$1.49 trillion, above the top of company guidance.

“OpenAI needs $400 billion in the next 12 months to pay for the compute and data centers it has publicly committed to — and to complete these deals by the end of 2026, OpenAI needs large swaths of this money by February 2026.”

Tech writer, host of the 'Better Offline' podcast and author of the 'Where's Your Ed At' newsletter

The 12-month window closes in October 2026. As of mid-2026 OpenAI had closed a March 2026 round at an $852 billion post-money valuation and was reported to have received roughly $50 billion of a $122 billion round — far below $400 billion — while raising its planned compute spending to a reported $750 billion through 2030.

“Google Cloud revenue growth will accelerate from 82% to 93% in the third quarter of 2026, with Alphabet posting $111.4 billion in sales after traffic-acquisition costs and $3.07 in GAAP earnings per share — ahead of Wall Street's $111 billion and $2.98 estimates.”

Managing Director and internet equity analyst, BofA Securities

Alphabet reports third-quarter 2026 results on October 28, 2026; the forecast cannot be judged until then.

“[On when Robotaxi/Cybercab rides will be available around the clock:] Next month or so. The next tech to merge on the v15 plan will enable it.”

Vice President of AI Software (Autopilot), Tesla

Said Sep 4, 2026Deadline Oct 31, 2026Ashok Elluswamy on X, September 4, 2026, reported by Teslarati

Tesla's paid Robotaxi service currently runs roughly 6 a.m. to 10 p.m. in seven US markets; 24-hour operation is tied to the next module of the FSD v15 stack, pointing to an October 2026 deployment.

“For the full year 2026, we expect to achieve AI semiconductor revenue of $56 billion, up approximately 180% from fiscal 2025.”

President and CEO, Broadcom

Said Jun 3, 2026Deadline Nov 1, 2026Broadcom Q2 FY2026 earnings call, June 3, 2026

Fiscal 2026 closes in early November 2026; after three quarters Broadcom raised the figure to $58 billion (September 2, 2026) with Q4 AI revenue guided at $21.7 billion, so the $56 billion forecast is tracking to be met or exceeded.

“We expect these deployments to drive our Q4 AI revenue to $21.7 billion, which is up 236% year-on-year. Based on this Q4 guidance, we expect our fiscal 2026 AI revenue to be $58 billion for the year, up 186% year upon year, and above our prior guidance of $56 billion.”

President and CEO, Broadcom

Said Sep 2, 2026Deadline Nov 1, 2026Broadcom Q3 FY2026 earnings call, September 2, 2026

Fiscal 2026 ends in early November 2026 and Q4 results have not yet been reported.

“I don't think we're there yet, where they can run the entire company without hiring engineers, but that might be a year, 18 months away.”

Co-founder and CEO, Replit

The 18-month outer bound runs to late November 2026; as of September 2026 vibe-coded startups are common but there is no evidence of companies generally operating without engineering staff.

“There's no fundamental reason that we are limited to Austin. In fact, next month we'll be launching in Dallas, and then the same software just scales to lots of other cities, along with the Model Y Robotaxis.”

Vice President of AI Software, Tesla

Said Oct 21, 2026Deadline Nov 30, 2026Tesla Q3 2026 earnings call, October 21, 2026

Dallas already had Model Y Robotaxi service since April 2026; this claim concerns the purpose-built Cybercab launching there in November 2026.

“Our work on personal superintelligence is now also the focus of Reality Labs. Muse is coming to Meta Glasses starting next month, and that will be an important step toward this.”

Founder, Chairman and CEO, Meta Platforms

Said Oct 21, 2026Deadline Nov 30, 2026Meta Platforms Q3 2026 earnings call, October 21, 2026

Deadline is end of November 2026; Muse, Meta's personal AI agent launched in September 2026, has not yet been confirmed as shipping to Meta Glasses.

“We believe both Nvidia and Microsoft will hit the $4 trillion market cap club this summer and then over the next 18 months the focus will be on the $5 trillion club — both are foundational pieces of the biggest tech trend we have seen in our 25 years covering tech stocks on the Street.”

Global Head of Technology Research, Wedbush Securities

The $4 trillion leg resolved correct — Nvidia crossed $4 trillion on July 9, 2025 and Microsoft followed later in July 2025 — and Nvidia reached $5 trillion in late October 2025; the 18-month $5 trillion window runs to late December 2026.

“Grok 5 will be AGI or something indistinguishable from AGI.”

Founder and CEO of xAI; CEO of Tesla and SpaceX

Said Oct 18, 2025Deadline Dec 31, 2026Elon Musk post on X, October 18, 2025

Target date is an editorial inference from xAI's own Grok 5 schedule (training start September 2025, release originally signalled for end-2025/early-2026). As of September 2026 Grok 5 has still not been released — it slipped from Q1 to Q2 2026 and remains in training — so the claim cannot yet be judged.

“We expect to be in production with the Cybercab, which is really highly optimized for autonomous transport, in probably — well, I tend to be a little optimistic with time frames — but in 2026. So yeah, before 2027, let me put it that way.”

CEO of Tesla

Said Oct 10, 2024Deadline Dec 31, 2026Tesla 'We, Robot' event, October 10, 2024

Deadline is end of 2026. Tesla announced in February 2026 that the first Cybercab had rolled off the production line at Giga Texas, so the claim appears on track pending volume production.

“2026 will likely see the arrival of systems that can figure out novel insights.”

CEO of OpenAI

Said Jun 10, 2025Deadline Dec 31, 2026Sam Altman personal blog, 'The Gentle Singularity', 10 June 2025

Deadline is end of 2026 and still open; OpenAI announced in September 2026 that it had reached its internal 'automated research intern' milestone, but independent evidence of AI systems producing genuinely novel insights remains contested.

“The AGI race has begun. We are building machines that can think and reason. By 2025/26, these machines will outpace college graduates.”

Former OpenAI Superalignment researcher; author of 'Situational Awareness: The Decade Ahead'

Said Jun 4, 2024Deadline Dec 31, 2026Situational Awareness: The Decade Ahead (Introduction), June 2024

Deadline runs to the end of 2026. Frontier models beat college graduates on many benchmarks and exams, but whether they 'outpace' graduates as workers is contested and not yet judgeable.

“'This is how much business is on the books. Half a trillion dollars worth so far' — cumulative Blackwell and Rubin revenue and bookings, including networking, across calendar 2025 and 2026.”

Co-founder and CEO, NVIDIA

Said Oct 28, 2025Deadline Dec 31, 2026NVIDIA GTC Washington, D.C. keynote — October 28, 2025 (CNBC)

Analysts read the figure as implying calendar-2026 data center sales well above consensus. At GTC in March 2026 Huang raised the number, saying NVIDIA now sees roughly $1 trillion of AI chip demand through 2027; final resolution needs full calendar-2026 results.

“Inflation surprises lower (not higher), the dollar rallies (not crashes), the rolling recession ends, AI drives structural deflation the bond market is only starting to price, and a 30+ year base in US capital spending just broke to the upside — with official CPI readings expected to 'surprise on the low side' over the next six to nine months.”

Founder, CEO and CIO of ARK Invest

Judged on end-2026 US CPI prints versus consensus at the time of the call, the trade-weighted dollar, and whether the housing/manufacturing 'rolling recession' ends; Wood framed the inflation leg as a six-to-nine-month call.

“If you look at the trajectory of improvement, systems like GPT-3 were maybe toddler-level intelligence, and then systems like GPT-4 are more like smart high-schooler intelligence. And then, in the next couple of years, we're looking at PhD-level intelligence for specific tasks.”

Chief Technology Officer, OpenAI (at the time); later co-founder/CEO of Thinking Machines Lab

The 'couple of years' window runs to the end of 2026. Frontier models already exceed human-PhD baselines on some narrow benchmarks, but whether that meets Murati's 'PhD-level intelligence for specific tasks' bar is a judgement to be made at the deadline.

“I think we will literally build a legion, at least one legion of robots this year, and then probably 10 legions next year — i.e. roughly 50,000 Optimus humanoid robots in 2026.”

CEO of Tesla

Said Mar 20, 2025Deadline Dec 31, 2026Tesla Q1 2025 company all-hands meeting, March 20, 2025 (Teslarati)

Deadline is end of 2026. Tesla built no 'legion' in 2025, and as of September 2026 series production at Fremont had not started (Tesla's Q2 2026 update said production was 'anticipated later this year'), making 50,000 units in 2026 effectively unreachable.

“We're going to be building a million-unit Optimus production line, hopefully with the production start towards the end of next year [2026].”

CEO of Tesla

Said Oct 22, 2025Deadline Dec 31, 2026Tesla Q3 2025 earnings call, October 22, 2025 (transcript)

Deadline is end of 2026. Tesla decommissioned the Fremont Model S/X lines in May 2026 and began converting them for a line designed for 1 million robots/year, but start of production had slipped from 'late July or August' to 'later this year' as of the Q2 2026 update.

“Isomorphic Labs expects to have its first clinical trials by the end of 2026.”

Founder and CEO, Isomorphic Labs; CEO, Google DeepMind; 2024 Nobel laureate in Chemistry

This is the revised version of Hassabis's missed end-2025 target; as of September 2026 no Isomorphic Labs trial start has been announced, and the deadline runs to 31 December 2026.

“We expect to have fully autonomous vehicles in probably somewhere between a quarter and half of the United States by the end of the year, pending regulatory approval... even if it is city-by-city, we expect to be in dozens of major cities by the end of the year.”

CEO, Tesla

Said Jan 28, 2026Deadline Dec 31, 2026Tesla Q4 2025 earnings call, January 28, 2026

As of mid-2026 Tesla had expanded robotaxi service to a handful of additional metros (Dallas, Houston, Phoenix, Miami, Orlando, Tampa, Las Vegas) with fleets still reported in the dozens per city, well short of the year-end target.

“By the end of 2026, you should expect us to be offering 1 million trips per week.”

Co-CEO, Waymo

Said Oct 27, 2025Deadline Dec 31, 2026TechCrunch Disrupt 2025 onstage interview, October 27, 2025

Waymo was reported at roughly 450,000 paid driverless trips per week in January 2026 — about an 80% increase over six months — while expanding to additional US cities, so reaching 1 million weekly trips by December 2026 remains open.

“We're calling the first one Prometheus and it's coming online in '26. We're also building Hyperion, which will be able to scale up to 5GW over several years. We're building multiple more titan clusters as well. Just one of these covers a significant part of the footprint of Manhattan.”

Founder and CEO of Meta

Prometheus is under construction at Meta's New Albany, Ohio campus (gas turbines plus nuclear supply deals signed with Vistra, TerraPower and Oklo in January 2026); Meta still says it expects the cluster online sometime in 2026, so the claim cannot be resolved before 31 December 2026.

“AI will surpass the world's best competitive programmer within one to two years.”

Co-founder and CEO of Cognition (maker of Devin, the 'AI software engineer')

Window closes at the end of 2026. Trending toward correct: OpenAI's system reportedly beat every human finalist at the AtCoder World Tour Finals in July 2026, about 19 months after the prediction, after losing narrowly to human champion Psyho at the 2025 edition.

“We're making good progress on a more personalized Siri, and as we've said before, we expect to release these features next year [2026].”

CEO, Apple

Deadline is end of 2026. The personal-context/on-screen-awareness Siri features were first promised at WWDC 2024, delayed in March 2025, and were reported to be targeted at a spring 2026 (iOS 26.4) release before slipping toward the WWDC 2026 / iOS 27 cycle.

“Grok will make a movie that is at least watchable before the end of next year [2026] and really good movies in 2027.”

CEO of Tesla, SpaceX and xAI; owner of X

First deadline is December 31, 2026 for an 'at least watchable' Grok-made movie, with a follow-on 2027 target for 'really good movies'; as of late 2026 xAI had released Grok Imagine video generation but no Grok-produced film.

“I think we're quite close to digital superintelligence. It may happen this year, and if it doesn't happen this year, next year for sure. Digital superintelligence, defined as smarter than any human at anything.”

CEO of Tesla, SpaceX and xAI

Deadline is end of 2026; 2025 passed with no system smarter than any human at anything, so resolution rests on the remainder of 2026.

“Our current expectation is that capex dollar growth will be notably larger in 2026 than 2025. We also anticipate total expenses will grow at a significantly faster percentage rate in 2026 than 2025, with growth driven primarily by infrastructure costs.”

CFO, Meta Platforms

Said Oct 29, 2025Deadline Dec 31, 2026Meta Q3 2025 earnings release and call, October 29, 2025

Benchmark: 2025 capex grew about $33 billion (from $39.23B to $72.22B); Meta's January 2026 guidance of $115-135 billion implies growth of $43-63 billion, so the claim looks on track but resolves only with full-year 2026 results.

Showing the 40 nearest deadlines of 183 pending claims. Browse the full index for the rest.

Already graded

Jobs & EconomyPartially correct
“In three to six months, AI will be writing 90% of the code. In twelve months, essentially all of it.”

CEO, Anthropic

Said Mar 10, 2025Deadline Mar 10, 2026Council on Foreign Relations interview (March 2025)

AI code generation grew explosively, and some AI labs report that a large majority of their own code is now AI-written — but 90% across the software industry did not materialize on this timeline.

“We think it is plausible that by September of next year [2026] we have an intern-level AI research assistant.”

CEO of OpenAI

On 6 September 2026 OpenAI said it had hit the 'automated research intern' goal — a system that carries out well-defined research tasks under human direction, including ones taking a skilled researcher days — and reported roughly 3.1 agent-workdays per human workday internally. The milestone is OpenAI's own self-assessment and has not been independently audited.

CapabilitiesIncorrect
“Grok 4.20 is coming out in 3 or 4 weeks.”

CEO of Tesla, SpaceX and xAI; owner of X

Said Dec 7, 2025Deadline Jan 4, 2026Post on X by Elon Musk, 7 December 2025

Grok 4.20 missed the 3–4 week window by a wide margin: it did not reach users until a limited beta on 17 February 2026, with the full rollout and general availability following in March 2026 — roughly two to three months later than promised. (The claim that it beat GPT-5.1 and Gemini 3 Pro came from third-party Alpha Arena trading-sim reports, not from Musk.)

CapabilitiesIncorrect
“I would guess that sometime in the next 12 to 18 months, we'll reach the point where most of the code that's going toward these efforts is written by AI. And I don't mean autocomplete... you give it a goal, it can run tests, it can improve things, it can find issues, it writes higher quality code than the average very good person on the team already.”

Founder and CEO, Meta Platforms

By the October 31, 2026 close of the 18-month window there was no evidence that goal-driven AI agents were authoring most of the code for Meta's AI/Llama efforts at above-'very good engineer' quality; Meta's own internal targets reported in 2026 were for AI-assisted coding (Creation org goal of 65% of engineers writing 75%+ of committed code with AI by mid-2026), which is the autocomplete-adjacent mode Zuckerberg explicitly excluded. In July 2026 Zuckerberg told staff at an internal town hall that agentic AI progress had not accelerated as expected and that the AI reorganization had 'not come to fruition,' and Meta never published an AI-written share.

CapabilitiesIncorrect
“We'll actually have a production-intent [Optimus V3] prototype ready to show off in Q1, probably February or March... It won't even seem like a robot. It will seem like a person in a robot suit.”

CEO of Tesla

Said Oct 22, 2025Deadline Mar 31, 2026Tesla Q3 2025 earnings call, October 22, 2025 (transcript)

No V3/Gen 3 prototype was shown in Q1 2026. Musk confirmed the delay on March 31, 2026, then on the April 22, 2026 Q1 call pushed the unveil to 'probably middle of this year' (later, closer to production start), citing polish and copycat concerns; it remained unrevealed as of September 2026.

CapabilitiesIncorrect
“Start of production [for Optimus at Fremont] is, we're assuming, somewhere around the late July, August time frame — though initial output will be 'quite slow' and the production rate this year is 'literally impossible to predict.'”

CEO of Tesla

Said Apr 22, 2026Deadline Aug 31, 2026Tesla Q1 2026 earnings call, April 22, 2026 (Electrek)

The late-July/August window was missed: Tesla's Q2 2026 update (July 22) said Fremont construction had begun with production only 'anticipated later this year,' Musk said on the call that Tesla 'will soon start production' with Optimus, and August 2026 reporting described the start as pushed to 'later this year.'

HealthcarePartially correct
“Highly complementary pipeline with approximately 10 clinical readouts expected over the next 18 months (Recursion alone expects 7 clinical trial readouts in that period).”

Nasdaq-listed AI-driven 'TechBio' drug discovery company; guidance issued under co-founder and CEO Chris Gibson

Several guided readouts did arrive (REC-994 in CCM in September 2024, REC-2282 in NF2 in Q4 2024, REC-4881 FAP data in May and December 2025), but the combined company fell short of ~10: in May 2025 Recursion terminated REC-994, REC-2282 and REC-3964 and cut other programs, the REC-4881 LILAC cancer trial was deprioritised and later terminated without a readout, and the REC-3964 C. difficile readout never occurred.

“If you go forward 24 months from now, or some amount of time — I can't exactly predict where it is — it's possible that most developers are not coding.”

CEO of Amazon Web Services

The 24-month horizon ran out in June 2026 with most professional developers still writing and reviewing code, albeit heavily AI-assisted; Garman was pressed on the expired prediction in a June 2026 Platformer interview and defended continued hiring of junior engineers. (He hedged with 'it's possible,' so the miss is on the substance rather than a firm commitment.)

“In the good old days it took 500 artists five years to make a world-class animated movie. I think it won't take 10 percent of that. Literally, I don't think it will take 10 percent of that three years out from now.”

Co-founder of DreamWorks SKG and former CEO of DreamWorks Animation; co-founder and managing partner, WndrCo

The 2026 Visual Effects & Animation World Atlas (140,000+ professionals at 2,900 companies, 1.1M datapoints) directly tested this claim and concluded a film that needed 500 artists in 2023 cannot yet be made by 50; author Joseph Bell found net industry growth of 2.7% over 12 months, AI-specific roles at just 0.1% of studio roles, and growth in artist categories (environment/DMP +9.3%, FX/sim +6.1%). AI-native features did appear at radically smaller scale (Critterz, ~$30M in nine months; Fable's 'Gods Don't Give Gifts', a 30-person team over nine months), but none has established itself as a 'world-class' studio-tier animated feature, and mainstream animated releases still carry full-size crews.

“In terms of someone looks at the model and even if you talk to it for an hour or so, it's basically like a generally well educated human — that could be not very far away at all. I think that could happen in two or three years.”

Co-founder and CEO, Anthropic

In the February 13, 2026 follow-up interview, Dwarkesh Patel quoted the prediction back to Amodei and told him 'You were right,' while adding that he had expected such a system to also automate large parts of white-collar work. Commentators agree the spirit held — an hour-long conversation with a 2026 frontier model matches or exceeds a well-educated generalist — though models remain trivially identifiable as AI in a literal imitation test.